Project Portfolio

Commercial Electrical Projects Across California

From EV infrastructure rollouts to switchgear modernization and multi-site tenant improvements.

Explore real completed projects organized by scope. Every installation delivered inspection-ready, on schedule, and built for long-term facility reliability. Serving commercial and industrial clients across Southern California and nationwide.

100% commercial
No residential work
Inspection-ready
First-time approval
C10 #1003962
Licensed & insured
Commercial EV charging station installation project

Featured Project

32-Station EV Deployment

LED Retrofits

LED Retrofits

3 Projects

Switchgear

Switchgear

1 Project

Trenching

Trenching

1 Project

Generators

Generators

2 Projects

29

Projects

Explore by Industry

See Projects Relevant to Your Facility Type

Planning an electrical project for your facility type?

Request a Consultation
29
Completed Projects
8
Project Categories
100%
Inspection Pass Rate
23
Industries Served

Built for Commercial Facilities

What These Projects Prove

Every project in our portfolio demonstrates the operational discipline, coordination, and compliance commercial facilities require.

Permitting Coordination

We pull all permits, coordinate plan checks, and manage inspector scheduling so your team stays focused on operations.

After-Hours Execution

Nights, weekends, and holidays. We schedule around your tenants and operations to eliminate disruption during business hours.

Multi-Location Program Management

Site-by-site scheduling, procurement, and reporting for franchise operators, property groups, and national accounts.

Utility Coordination

We handle utility applications, meter upgrades, transformer requests, and interconnection approvals from start to finish.

Safety and Compliance

OSHA-compliant crews, lockout/tagout protocols, hot work permits, and site-specific safety plans on every project.

Warranty and Service Continuity

Workmanship warranties on every installation, with manufacturer warranties passed through and ongoing maintenance available.

Commercial Electrical Project Portfolio

Real results from real commercial facilities. Browse completed projects organized by scope to see the quality, coordination, and professionalism we bring to every job.

Representative projects across commercial, industrial, and multi-site programs throughout California.

Category

EV Charging

Level 2 and DCFC deployments for dealerships, fleet yards, retail, and multi-tenant properties.

4 completed projects

Back to top
32-Station EV Charging Deployment
Project 01
EV Charging

32-Station EV Charging Deployment

Full Level 2 and DCFC infrastructure for a high-volume auto dealership campus.

Los Angeles CountyAuto Dealership
  • 32 Level 2 + 4 DCFC stations
  • 1,600A service upgrade required
  • Completed in 6 weeks
Utility CoordinationDesign-Build

Full Level 2 + DCFC deployment completed in 6 weeks with zero operational downtime.

Discuss a similar project
Fleet Yard EV Charging Conversion
Project 02
EV Charging

Fleet Yard EV Charging Conversion

Depot-scale charging infrastructure for municipal fleet electrification program.

Ventura CountyFleet Facility
  • 24 fleet charger positions
  • Load management system
  • Utility transformer upgrade
Utility CoordinationDesign-Build

Operational fleet charging depot supporting 24 vehicles on overnight rotation within 5 weeks.

Discuss a similar project
Multi-Location Fuel Center EV Install
Project 03
EV Charging

Multi-Location Fuel Center EV Install

Phased EV charger rollout across a petroleum retail chain adding charging to existing fuel centers.

Southern CaliforniaGas Station
  • 6 locations, 4 stations each
  • Phased rollout over 10 weeks
  • Rebate coordination per site
Multi-Site ProgramUtility Coordination

24 total stations deployed across 6 fuel centers with coordinated utility approvals at every site.

Discuss a similar project
Retail Center Customer EV Stations
Project 04
EV Charging

Retail Center Customer EV Stations

Customer-facing Level 2 chargers installed in a multi-tenant retail parking structure.

Thousand OaksRetail Center
  • 8 Level 2 dual-port stations
  • Parking structure conduit routing
  • ADA-compliant layout
Tenant OccupiedAfter-Hours

16 charging ports operational in covered parking, attracting EV drivers to tenant businesses.

Discuss a similar project

Planning a similar EV Charging project?

Discuss Your Project
Category

Lighting

LED retrofits, parking lot pole replacements, canopy upgrades, and high-bay conversions for commercial facilities.

6 completed projects

Back to top
Retail Plaza LED Parking Lot Retrofit
Project 01
Lighting

Retail Plaza LED Parking Lot Retrofit

Full parking lot LED conversion for a 120,000 SF multi-tenant retail center.

Ventura CountyRetail Center
  • 140+ pole fixtures replaced
  • Photocell and timer controls
  • 65% energy reduction
After-HoursTenant Occupied

62% energy reduction across 140+ pole fixtures with improved site visibility and safety.

Discuss a similar project
Canopy LED & Pump Circuit Upgrade
Project 02
Lighting

Canopy LED & Pump Circuit Upgrade

Complete canopy lighting replacement and fuel dispenser circuit modernization.

Kern CountyGas Station
  • 12 canopy fixtures upgraded
  • 8 pump circuits rewired
  • 58% energy savings
After-Hours

Complete canopy retrofit with 58% energy savings and improved nighttime visibility for customers.

Discuss a similar project
High-Bay LED Warehouse Conversion
Project 03
Lighting

High-Bay LED Warehouse Conversion

Full high-bay LED replacement across a 200,000+ SF distribution warehouse.

Riverside CountyWarehouse
  • 180+ high-bay fixtures
  • Occupancy sensors per zone
  • 70% energy reduction
Tenant Occupied

180+ high-bay fixtures replaced with instant-on LEDs, delivering 70% energy reduction.

Discuss a similar project
Dealership Showroom & Lot LED Upgrade
Project 04
Lighting

Dealership Showroom & Lot LED Upgrade

Showroom architectural LED lighting and exterior lot pole replacement for a luxury auto dealership.

Westlake VillageAuto Dealership
  • Showroom color rendering upgrade
  • 42 lot pole fixtures
  • OEM brand compliance
After-HoursDesign-Build

Premium showroom lighting with 90+ CRI and lot visibility improved to dealership brand standards.

Discuss a similar project
Multi-Location QSR LED Rollout
Project 05
Lighting

Multi-Location QSR LED Rollout

Standardized LED interior and exterior lighting upgrade across a quick-service restaurant chain.

Southern CaliforniaRestaurant Chain
  • 8 locations, 4-week program
  • Interior and drive-thru lighting
  • Overnight install schedule
Multi-Site ProgramAfter-Hours

8 locations upgraded in 4 weeks with consistent light quality and 55% average energy reduction.

Discuss a similar project
School District Classroom LED Retrofit
Project 06
Lighting

School District Classroom LED Retrofit

District-wide LED classroom lighting upgrade across 12 school buildings.

Ventura CountySchool District
  • 12 buildings, 3,000+ students
  • Summer schedule execution
  • 65% energy cost reduction
Multi-Site Program

All 12 buildings completed during summer break, improving classroom visibility and cutting energy costs 65%.

Discuss a similar project

Planning a similar Lighting project?

Discuss Your Project
Category

Tenant Improvements

Full-scope electrical buildouts for office, retail, and industrial tenant spaces, including Title 24 compliance.

4 completed projects

Back to top
Multi-Tenant Office TI Buildout
Project 01
Tenant Improvements

Multi-Tenant Office TI Buildout

Complete electrical buildout across 4 office suites in a Class A commercial building.

Ventura CountyCommercial Office
  • 12,000 SF across 4 suites
  • Full Title 24 compliance
  • Data/telecom rough-in included
Tenant Occupied

12,000 SF office buildout completed on schedule across 4 suites with full Title 24 compliance.

Discuss a similar project
12-Suite Retail Tenant Improvement Program
Project 02
Tenant Improvements

12-Suite Retail Tenant Improvement Program

Sequential electrical buildouts for 12 retail tenant suites with standardized specifications.

Thousand OaksRetail Center
  • 12 suites, sequential buildout
  • Standardized spec package
  • Multi-trade coordination
Multi-Site ProgramTenant Occupied

All 12 suites delivered inspection-ready on a rolling schedule, no tenant occupancy delays.

Discuss a similar project
QSR Kitchen Electrical Buildout
Project 03
Tenant Improvements

QSR Kitchen Electrical Buildout

Full kitchen electrical infrastructure for a new quick-service restaurant franchise location.

OxnardRestaurant
  • Dedicated equipment circuits
  • Hood and exhaust wiring
  • 200A sub-panel install
Design-Build

Kitchen passed electrical and health department inspections on first visit, open date met.

Discuss a similar project
Industrial Tenant Warehouse Buildout
Project 04
Tenant Improvements

Industrial Tenant Warehouse Buildout

Electrical buildout for an industrial tenant requiring 3-phase power and specialized equipment circuits.

Santa ClaritaIndustrial
  • 3-phase 400A service
  • CNC machine circuits
  • Compressed air system wiring
Design-Build

Full industrial electrical buildout supporting heavy manufacturing equipment, delivered 2 days early.

Discuss a similar project

Planning a similar Tenant Improvements project?

Discuss Your Project

Don't See Your Project Type?

These are representative examples from our portfolio. We complete hundreds of commercial electrical projects every year across 23 industries. Contact us and we can share relevant case studies tailored to your facility and scope.

Why Facilities Teams Choose OES for Every Project

We are a commercial-only electrical contractor headquartered in Southern California. Every project in our portfolio is executed by licensed crews with the coordination, documentation, and inspection-ready workmanship your facility demands.

Commercial-Only Focus

Every project is executed by crews trained exclusively for commercial and industrial environments. No residential work, ever.

Inspection-Ready Workmanship

Clean conduit, proper labeling, and complete documentation. Our work passes inspection the first time with professional turnover packages.

Minimal Disruption Scheduling

After-hours, phased work, and tight coordination. We plan around your operations so your business keeps running.

Turnkey Project Capabilities

From design and permitting to trenching and commissioning, we handle the complete scope under one contract.

Project Portfolio FAQs

Common questions about project timelines, permits, safety, and how we work with commercial facilities.

01Does OES pull permits and handle inspections for every project?

Yes. We handle all permit applications, inspector coordination, and final sign-offs. Every project is delivered inspection-ready so your facility stays compliant without extra effort on your end.

02Can OES perform work after hours or during off-peak periods?

Absolutely. Most of our commercial projects are scheduled around tenant operations. We routinely complete shutdowns, cutovers, and phased work on nights, weekends, and holidays to minimize disruption to your business.

03Do you work with multi-location or national accounts?

Yes. We serve property management groups, franchise operators, and national brands across California and nationwide. Our coordination team handles site-by-site scheduling, procurement, and reporting so you get consistent results across every location.

04What is a typical timeline for a commercial electrical project?

Timelines vary by scope. A single-site LED retrofit may take 1 to 2 weeks. Larger projects like EV charging deployments or switchgear replacements typically run 4 to 8 weeks from permit to final inspection. We provide a detailed schedule during the proposal phase.

05Does OES offer warranties on completed work?

Yes. All OES projects include workmanship warranties. Material warranties vary by manufacturer and product but are always passed through to you. We stand behind every installation and are available for warranty service calls if anything comes up.

06Can you provide ongoing maintenance after a project is completed?

We offer structured maintenance programs for commercial facilities. Many clients transition from project work into a preventive maintenance agreement to keep their electrical systems running efficiently and reduce emergency repair costs over time.

07How does OES handle safety and compliance on active job sites?

Safety is built into every project plan. Our crews follow OSHA standards, maintain current certifications, and coordinate with your facility management team on lockout/tagout, hot work permits, and site-specific safety requirements.

08What information do you need to provide a project estimate?

A site walk or detailed scope description is the best starting point. For most projects we need the facility address, existing electrical service details, and your goals for the project. Contact us and we will schedule a no-obligation site assessment.

Ready to Start Your Next Project?

Connect with our Southern California-based team to discuss your commercial electrical project. With 14 specialized services across 6 categories serving 23 industries, locally and nationwide, we have the expertise and coordination to deliver exactly what your facility needs.